* This page is to set the UPS configuration. Any wrong settings will cause incorrect display values or disconnection between the UPS and NetAgent.
 
haberlesme protokolu This section is to set up the communication interface of the UPS. (eg. Contact Closure/RS232/3 phase etc.) Please refer to the UPS manual to set the correct communication type. Any wrong settings will cause disconnection between the UPS and NetAgent.
Akü Sayisi,
Akü Dolu Sarj Gerilimi (V),
Akü Bitik Sarj Gerilimi (V)
Please refer to the UPS manual to set the value.
En son akü degisim tarihi (aa/gg/yyyy) This section is to record the date when the UPS battery was last replaced.
 
UPS Testi
UPS'i testi et.Her; This section is to schedule the UPS to test once a week or once every two weeks or not to test.
UPS'i testi et. Asagidaki Günlerde; This section is to set the UPS to test on a particular day of a week.
UPS Testinin Baslama Zamani (ss:dd) This section is to set the UPS to test at a certain time on the test day.
UPS Test Tipi This section is to select the type of self test to perform.
UPS Kaydi
UPS Veri Kaydi This section is to set how often the UPS data should be logged.
 
 
Baglantida kayip olduktan sonra zaman asimi This section is to set a period of time after which NetAgent will send a disconnection warning message. This warning message will be sent after NetAgent has lost contact with the UPS for the time specified.
Kritik Yük (%) This section is to set the UPS critical loading. (shown as %) NetAgent will send a warning message when the UPS is overloaded.
Kritik Sicakli (°C) This section is to set the UPS critical internal temperature. NetAgent will send warning messages when the UPS overheats.
Kritik Kapasite (%) This section is to set the UPS critical battery capacity (shown as % )NetAgent will send warning messages when UPS low battery occurs.